Fort St. John - DGS Astro Paving, Terus

Alaska Highway Twinning Fort St. John

May to November

The Alaska Highway Corridor improvement is an ongoing project to twin the highway through Fort St John to Charlie Lake.

Our portion was from old fort rd. to the 269 rd it included shoulder excavation both sides.

Approx 70,000 tonnes of gravel and 15,000 tonnes of asphalt, Street lighting was installed the length of the project and two signaled intersections were built.

Drainage was improved by the addition and replacement of culverts. Island curb was poured and caped with Asphalt to direct traffic properly.

 